A Guide to Residential Construction Contingencies for Builders: Managing the Unexpected


In the world of residential construction, it’s often said that the only predictable thing is unpredictability. Whether it’s unforeseen soil conditions or sudden spikes in material prices, every construction project has its share of surprises.

These unplanned incidents or costs are precisely why builders should understand and factor in construction contingencies.

This article explains the essentials of residential construction contingencies and offers insights for builders to navigate them effectively.

What Are Construction Contingencies?

At its core, a construction contingency is a reserve amount of money set aside to cover unforeseen expenses that arise during a building project. Typically expressed as a percentage of the overall construction budget, this reserve ensures that the project doesn’t stall when unexpected costs surface.

But to truly understand its significance, it’s vital to break down its multifaceted nature:

  1. Risk management: At its essence, a construction contingency is a risk management tool. It acknowledges the inherent uncertainties in any construction project, from geological surprises beneath the ground to sudden weather events that can delay work.
  2. Types of contingencies:
    • Design contingency: This is often used in the early stages of a project when the design is not yet finalized. As the design evolves and becomes more detailed, some elements might cost more than initially anticipated.
    • Construction contingency: This is for unforeseen events related directly to the building process, such as labor issues, equipment failures, or unexpected material cost hikes.
    • Owner’s contingency: Separate from the amounts that contractors set aside, this is a reserve that the project owner maintains to address changes they might want or unanticipated challenges that don’t fall under the purview of the contractor’s responsibilities.
  3. Calculation factors: While the contingency is often expressed as a percentage, the specific percentage isn’t arbitrary. It’s determined by evaluating various factors, including the project’s complexity, past experience, site conditions, project duration, and even the local regulatory environment.
  4. Evolution over time: As the project progresses and unknowns become knowns, the amount of contingency needed may decrease. Regularly revisiting and adjusting the contingency amount can free up resources or provide a clearer picture of the project’s financial health.
  5. Legal and contractual considerations: In many contracts, especially for large projects, the use of contingency funds and the conditions under which they can be tapped might be strictly defined. This ensures transparency between contractors and clients and sets clear guidelines for unforeseen expenses.

Why Are They Crucial for Residential Construction?

Unpredictable Conditions

Residential construction often involves working on sites that might have been untouched for years.

There could be unforeseen soil conditions, hidden water tables, or even buried remnants from past structures that can derail your initial plans.

Construction management software helps document and archive site assessments, ensuring that any unusual conditions are flagged and accounted for in both planning and budgeting.

Material Price Fluctuations

Economic factors can lead to sudden changes in the prices of essential construction materials. Having a contingency allows builders to proceed without compromising on quality.

With its inventory tracking and vendor communication features, BuilderPad enables builders to get real-time price updates, helping anticipate spikes and making the necessary budgetary adjustments.

Design Alterations

Sometimes, what looked good on paper may not materialize as expected, necessitating design alterations. These changes can increase costs.

By integrating design tools and allowing for change logs, BuilderPad ensures that any design modifications are instantly recorded and announced, keeping stakeholders informed.

Updates
Get notified of every progress update, delays and milestones

Regulatory Hurdles

Zoning laws and building codes can sometimes throw a wrench into the works. Staying compliant might mean additional work and expenses.

By providing a repository for latest regulatory guidelines and integrating them with project planning, BuilderPad ensures builders stay on top of compliance requirements.

How Much Should Be Set Aside?

While general guidelines suggest:

  • New Builds: 5-10% of the total budget.
  • Renovations: 10-20% of the total budget.

It’s essential to assess each project individually.

How much to set aside

There are several nuanced factors and considerations that builders should take into account to determine the appropriate contingency amount:

  1. Project Complexity: More complex projects with intricate designs, specialized materials, or cutting-edge technologies will inherently carry more uncertainties. Such projects might require a higher contingency allocation to cater to unexpected challenges or specialized solutions.
  2. Project Size and Duration: Longer projects tend to have more uncertainties, simply because they span across extended periods. Market conditions, labor rates, or even regulatory frameworks can change over time, necessitating a larger contingency reserve.
  3. Past Experience: Historical data and past project experiences are invaluable. If previous projects of similar nature frequently encountered unforeseen costs, it would be prudent to set aside a more generous contingency for upcoming endeavors.
  4. Site Conditions: Sites with unknown conditions, or those in challenging terrains (like waterfronts, hillsides, or dense urban environments) may necessitate a heftier contingency. If comprehensive site surveys haven’t been conducted, or if a site has a history of surprises, a higher contingency percentage might be in order.
  5. Economic Climate: In periods of economic volatility, material prices and labor costs can fluctuate more unpredictably. During such times, it might be wise to have a more substantial contingency to buffer against these fluctuations.
  6. Contractor’s Track Record: If working with a new contractor or one with a varied track record, it might be prudent to allocate a higher contingency. Conversely, a seasoned contractor with a stellar track record might justify a slightly lower contingency.
  7. Flexibility of Scope: If there’s a likelihood that the project scope might expand or change based on client feedback or evolving requirements, a more considerable contingency can help accommodate these changes without disrupting the project’s financial health.

Tips for Managing Construction Contingencies

Thorough Site Analysis

Before starting a project, conduct a detailed site analysis. This includes soil tests, site accessibility assessments, and reviews of any existing structures.

BuilderPad allows for easy upload, storage, and sharing of site reports, ensuring all involved parties are on the same page.

File storage BuilderPad
BuilderPad ensures all involved parties are on the same page.

Regular Budget Reviews

Ensure you’re reviewing the budget regularly, tracking contingency usage.

Open Communication

Keep clients and stakeholders informed about contingency usage and potential budget changes.

Through integrated communication channels, BuilderPad ensures everyone is updated in real-time, fostering trust and transparency.

communication
BuilderPad fosters effective communication between all parties involves in a construction or remodeling project

Flexible Planning

Be ready to adjust your construction approach based on emerging challenges.

With BuilderPad’s agile management, you can use tools that allow task adjustments, resource reallocation, and timeline shifts, the software ensures adaptability throughout the project lifecycle.

Conclusion

Construction contingencies are more than just a financial buffer; they’re a testament to a builder’s foresight and commitment to a project’s success.

By integrating knowledge about contingencies with powerful tools like BuilderPad, builders can ensure a streamlined, informed, and proactive approach to residential construction, consolidating their reputation as industry leaders.

Mark Thompson

Mark Thompson, co-founder of BuilderPad, lives and breathes SaaS and disruption. With a 15-year career journey marked by innovation, he's now channelling his passion into modernizing the home construction industry. Mark loves connecting with builders, understanding their day-to-day hurdles, and uses his tech-savvy brain to transform these challenges into opportunities. He's not just a tech guy, but a listener and problem solver for the hardworking builder community. When he's not diving deep into construction or sharing his wisdom on the blog, Mark's got his eye on the next big tech breakthrough. Join him on his journey as he redefines the industry, one blog post at a time.

SPRING 2023 EDITION

STATE OF CONSTRUCTION

A free, quarterly report to help home builders made data-driven decisions with KPIs and trend analysis in the top 50 US markets.


+21K Construction Professional have already subscribed

BLOG POST

RELATED POSTS

How to Build Residential Construction Schedule

For construction business owners, building efficient and effective residential construction schedules is pivotal to success. It’s not just about managing time; it’s about optimizing resources, foreseeing challenges, and ensuring customer satisfaction. In the rapidly evolving construction

READ MORE  

Types of Subcontractors in Construction: Examples, Lists and Resources

For construction business owners, understanding the different types of subcontractors and their roles is crucial for the smooth execution of any construction project. This article lists various kinds of subcontractors, differentiating them from general contractors, and provides a comprehensive list

READ MORE  

The High Cost of Rushed Timelines: Navigating Unrealistic Deadlines in Construction Management

In construction management, the pressure to meet or beat deadlines is a constant challenge. Clients often demand faster completion times, often setting unrealistic deadlines. This article explores the implications of these rushed timelines, exploring the risks, impacts, and strategies for effective

READ MORE