Scheduling

Every phase.
Every task.
Every predecessor.

Build a full construction schedule — phases, tasks, predecessors, and percent-complete — in a Gantt that actually understands how homes get built.

List, Gantt, calendar viewsCritical pathiOS + Android
Construction Schedule
Critical path · onWeek
Task
Days
MarAprMayJunJulAug
Foundation · Concrete pour
12
FramingCRITICAL
18
Rough-in MEPCRITICAL
14
MEP Inspection
2
DrywallCRITICAL
10
Interior trim & paint
16
Cabinetry install
8
Final walkthrough
2
Today
CompleteIn progressCritical pathUpcoming
12 phases · 86 tasks · Maple Residence
— Scheduling by the numbersAcross 2,400+ customer projects
Avg tasks / project86+Not counting predecessors, which auto-link.
Views3List, Gantt, calendar. One click to switch.
Schedule delay recovered6.4 daysAverage, after moving off spreadsheets.
Reschedule latency< 1 secDrag a bar, all dependents update instantly.
— Three ways to see it —

One schedule. Three views. Pick the one your brain uses.

01 · List

Phase-by-phase with % complete.

Collapsible phases. Completion bars roll up from the tasks inside. Filter by status or phase.

Pre-Construction (3)100%
Lot / Foundation (8)63%
Clear Lot · 38%
Install Silt Fence · 25%
02 · Gantt

Time, tasks, dependencies.

Drag bars to reschedule. Predecessor arrows auto-adjust. Toggle critical path on when you need it.

MARAPRMAYJUN
Foundation
Framing
MEP
Drywall
03 · Calendar

What's happening this week.

Month, week, and day views. Export to Google + Apple calendars. Share with subs automatically.

MTWTFSS
14
TueDrywall begins
FriClient walk · selections
Dependencies

One task slips.
Everything downstream
moves with it.

Predecessors are the DNA of a construction schedule. Link tasks with four dependency types — start-to-start, finish-to-start, start-to-finish, finish-to-finish — plus lag days. When rough-in gets delayed, drywall, trim, and final walkthrough move automatically.

  • 4 dependency types — the ones that actually come up in a build.
  • Lag days for cure times, inspections, weather buffers.
  • Auto-notify affected subs the moment a schedule change lands.
FramingCRITICAL
Rough · Drywall
Add predecessor
Item detailsPredecessors
ITEM
MEP inspection
TYPE
Finish to Start
LAG DAYS
2
— Checklists & Punchlists

Punchlists and checklists, built into the schedule.

Spin up a checklist for any phase — a pre-drywall QA list, a sub's scope checklist, or a final-walk punchlist — from a reusable template. Assign items, attach photos, set due dates, and collect sign-off so nothing slips through the cracks between phases.

  • Reusable checklist & punchlist templates
  • Assign items to crews or subs with due dates
  • Attach photos and notes to any item
  • Track completion and capture client sign-off
Punch list · Final walkMaple Residence
2 / 5 done
Touch-up paint
Master bath
JM
Caulk window trim
Kitchen
RS
Adjust cabinet door
Kitchen · 1 photo
MC
Replace cracked tile
Foyer
RS
Final clean
Whole house
Reusable templateSend for client sign-off →
— More power on tap —

The scheduling moves you already make. Now faster.

CRITICAL PATH

See what's actually driving your end date.

Toggle on to highlight the tasks where any delay moves the final walkthrough. Hide everything that doesn't — focus on what matters this week.

CRITICAL PATH · ON
3 of 8 tasks
Foundation
Framing
Rough-in MEP
Selections
Drywall
PHASE PROGRESS

One glance. Every phase. Every % complete.

Completion rolls up from the tasks inside each phase. Ahead reads green, behind reads red — so your Monday morning starts with facts, not wishful thinking.

Pre-Con100%
Foundation72%
Rough-in0%
Architectural Plans100%
Building Permit85%
Clear Lot / Tree Removal38%
— The schedule is the spine —

Every other part of BuilderPad hangs off it.

Scheduler's take

Rebuilt 86 tasks
in 2 hours.

Before2 days
After2 hours

GoldenLeaf Building Co.
Raleigh, NC · 20 projects/year

The day a weather delay hit framing, I dragged one bar and watched the whole back half of the schedule move — inspection, drywall, draw milestones, everything. Three subs got notified automatically. Would've taken me a full Saturday in MS Project.

Grady Sinyard
Grady SinyardCo-Founder · GoldenLeaf Building Co.
Read the full story →
— Pairs well with —

The rest of the platform.

— Bring your next build —

See a schedule
that moves with you.